Facility Maintenance Contracts |
|
Agency | Contract Type / Work Description |
GSA SCHEDULE 03FAC Facility Maintenance and Management | MASE have been awarded with the Refrigeration, Heating, Ventilation, Air Conditioner, Boiler and Chiller HVAC Maintenance. |
GSA R2 | Top to Bottom Maintenance of a 2000 tons chiller plant equipment including 4 Trane centrifugal chillers, cooling towers and pumps |
VA Caribbean | Maintenance of the most critical mechanical equipment in a large VA facility including: Maintenance of the VA Caribbean Health Care system BAS for the past four years. Maintenance of the VA Caribbean Health Care system Critical AHUs for the past two years Maintenance of 8 large centrifugal chillers on VA San Juan Maintenance of 11 cooling towers at the VA San Juan |
VA Caribbean | Various contracts for equipment repairs such as boilers, pumps, plumbing, electrical services |
VA Alabama | Maintenance of mechanical systems in the hospital including chillers, cooling towers, air handlers, pumps and building management system |
DOD | Repair Trane Centrifugal Chiller at Antilles Ramey School Replacement of a 50 tons screw compressor |
BAS and Smart Buildings Contracts |
|
Agency | Contract Type / Work Description |
GSA Schedule 03FAC | MASE have been awarded with the smart building system integrator SIN. |
GSA R2 | MASE was contracted to correct deficiencies left by a previous contractor on an energy ARRA funded project. A Trane Tracer SC BAS installation was verified corrected and commissioned as per original design intent. It was a highly complex BAS focused on energy savings and tenant comfort. |
USDA | Installation of a new BAS to reduce energy consumption of a federal facility. Energy consumption was reduced by 50% |
Schneider Electric /GSA R2 | 1.Installation programming and configuration of the BAS system for the Federal Government’s first NET ZERO project at the St. Croix USVI Federal Courthouse 2.Integration of more than 5 different BAS vendors into one common platform for the ESPC project on the Old San Juan and St. Thomas US Courthouses |
Construction Contracts $10,000,000.00 Bonding Capacity and Fully Insured Contractor |
|
Agency |
Contract Type / Work Description |
GSA R2 |
Hurricane Maria Disaster Recovery. Installation of temporary roof on an FBI facility, Electrical Generator Repair after damaged suffered, Gate repairs, Roof Drain cleaning. |
VA Ceiba Clinic |
Emergency installation of shutters on the ceiba clinic to prevent damage by Hurricane Irma and Hurricane Maria. The clinic did not suffer any internal damage thanks to the installation of shutters. |
VA Ceiba Clinic |
Clinic Revitalization including: Fence Repair, Exterior and Interior painting, Windows Leakage repair, pavement repair, Clinic Gate repair, Land Scaping |
VA San Juan |
Emergency replacement of a large sprinkler water tube on the VA hospital that was leaking. The tube was underground and we had to excavate the area to perform the repair. |
DASE |
Hurricane Maria Disaster Recovery. Large Roof HVAC units were torn out from their bases. We build new bases and reinstalled the units. |
FAA |
Replacement of five dx split systems on the FAA radar station at the rain forest peak. Project was performed without disturbing operations on one of the most remote locations in the island. A concrete and steel base capable of supporting the equipment was constructed |
GSA R2 |
Chiller Plant Replacement and Optimization in Old San Juan FOB and US Courthouse |
GSA R2 |
Chiller Plant Replacement and Optimization in the St Thomas FOB and US Courthouse |
GSA R2 |
Replacement of two AHU’s and installation of two supply fan for demand control ventilation. The project included the reprogramming of the AHUs sequence in order to account for the new demand control ventilation requirement. |
GSA R2 |
Dampers installation and balancing of the airside system of an occupied US Courthouse in St. Thomas. The project included reprogramming of the AHUs to improve comfort on the areas |
GSA R2 |
Seepage pit cleanout on US Courthouse in St. Croix. Cleaning of a water runout pit to avoid terrain erosion. |
GSA R2 |
Replacement of the fire alarm system of an occupied US Courthouse at St.Croix. A new state of the art system was installed including graphics, annunciation and remote communications |
GSA R2 |
Chilled water pipe coupling and fitting replacement on an occupied US Courthouse |
CDC |
Three projects for replacing two chillers, one air handler, and 15 exhaust fans on the CDC Puerto Rico Office. |